Feel like I'm forgetting something. Any feedback?
From left to right, top to bottom, WXM, FMM, FMM, ASM, 2016; VarioS return, VarioS Skimmer, BoB, then DOSs and EBs.
I'm planing to router out cable holes with rounded edges in all the circled places. There will be a cabinet over the EB832s right below the DOSs. I plan pass throughs right above the EB832s to route the power cords out. Cut outs next to EBs are for 1Link and DC24.
I don't have the ASM yet, but I want to finish this nicely, so it'll all be pre-drilled and waiting. Just looking for any obvious stuff I'm missing.
I might need a 1LINK module in the future so I'm leaving some space. 2x WAV, 1x COR, 2xDOS, 1x Trident doesn't leave me with any more. Or a a Vectra controller if the COR doesn't work.IMG_0947.jpg
This panel will be finished to match and installed in the back of my "chiller" compartment. The DDRs will sit in the front.
Bookmarks