Yes, you can do it with a Feed cycle. Pick one of the 4 Feed cycles (A, B, C, or D), then set the Feed? Interval for that Feed cycle to the length of time (in minutes) you want to use. You do this on the Misc settings page using either APEX Local or APEX Fusion. Let's say you use FeedB and want the top-off process to last 15 minutes. Use 15 in the FeedB Interval, then program one solenoid output like this:
[Solenoid1]
Fallback OFF
Set OFF
If FeedB 000 Then ON
The second solenoid may be programmed exactly the same, or you can make it mirror the ON/OFF state of Solenoid1, like this:
[Solenoid2]
Fallback OFF
Set OFF
If Output Solenoid1 = ON Then ON
There's no functional difference between the two.
Bookmarks