Hi Everyone, I am new to Apex programming and need some help. I just got a Kalk Reator and tried to program it.
I have a Tunze ATO that is programmed into Apex. The ATO pumps water into a Kalk Reactor which then sends the Kalk mix into the sump. This is triggered when the Apex sensor detects a drop in the Return section of the Sump. This is how it is programmed
Fallback OFF
Set ON
If Output WaterChange = ON Then OFF
Defer 008:00 Then ON
If pH > 8.50 Then OFF
Part of the programming is to turn off the Tunze when I have a nightly water change which pumps 4 gallons out of the sump and then pumps 4 gallons from a mixing tank into the sump. During this time the ATO is off. I included the last line which is to turn the ATO off if PH goes above 8.5.
The Kalk Reactor is set to turn on four times a day which mixes the Kalk. The programming is as follows:
Fallback OFF
OSC 000:00/015:00/345:00 Then ON
So if something goes haywire and the ATO pumps water into the Kalk Reactor and the Kalk Reactor pumps kalk into the sump and it does not stop then the PH will rise to 8.5 and the ATO will shut down which shuts down the Kalk Reactor and I do not have a Reef Tank crash.
This is the first time that I have programmed the APEX since I had paid someone to do the initial programming. Can someone please look at how I programmed the areas in bold and confirm that I did it correctly.
Thanks for your help!
Bookmarks