Hey everyone. New here to the forum and looking for some help in creating a program for my Jebao DP-4 dosing pump. I would like to hook this up to an outlet on my Apex to prevent any of the 4 peristaltic pumps from getting stuck while dosing. My thought is that once I have set my dosing schedule for each of my 4 peristaltic pumps, the apex will turn the outlet off if power is pushed to the doser for longer than my longest set time for dosing. For example, if my longest On time for any of the 4 pumps is 10 seconds, the Apex will detect that power has been drawn for 11 seconds and turn the outlet off. Does this make sense, and if so, is this possible?
I thought about basing this off of time and turning the outlet on at given intervals each day to dose; however, in the likely event that the DP-4 and Apex do not have identical times programmed into them, at some point the times with be off and this programming would be bad.
Bookmarks