Originally Posted by
deputydog95
I have a similar question...
I was playing with the two Wav's on my 112g SPS (4 ft long) yesterday. I moved the pumps all over the place and finally settled with one on each side panel, in the middle, about 2/3rds the way up.
I accidentally started running just one pump (instead of both) in Pipeline at about 80% with a .75 second delay. Created a really impressive "sloshing effect", gently moving all the water in the tank, on both sides.
I was thinking I'd love to have that setup running for a period of time during the day where it was in Pulse on the left pump for 2 hours, and then Pulse on the right pump for 2 hours, always with the opposite pump being completely turned off so only one was running at a time.
However, when I tried to program it, every time i added a new point, Apex strung the points on the graph together and created more of a ramp down ramp up effect and both were still running at the same time.
The flow was so impressive with just one on high, I'm trying to find a way to make it happen where just one is running for a period of the time with the other completely off. And then alternate
How could that be achieved?
Bookmarks