Results 1 to 2 of 2

Thread: Dos Calbiration

  1. #1
    New User
    Join Date
    May 2018
    Location
    US, Pacific Time
    Posts
    6

    Dos Calbiration

    I calibrated both my Dos but then had to change the base unit(brain). Do I need to recalibrate?

  2. #2
    Frequent Contributor zombie's Avatar
    Join Date
    Dec 2013
    Location
    Denver, CO
    Posts
    13,176
    Calibration data is supposed to be stored in the DOS, but I would do it again anyway just to make sure everything is working as it should and fine tune the calibration.

    Sent from my SM-G965U using Tapatalk

Similar Threads

  1. Question: How to dos using if time and defer on my DOS
    By Nagreen8 in forum Apex Programming for Dosing, ATO, and AWC
    Replies: 4
    Last Post: 11-15-2020, 15:35
  2. Does the DOS have to be above the DOS reservoir and above the water line in the sump?
    By deputydog95 in forum DŌS & DDR – Dosing and Fluid Metering System
    Replies: 16
    Last Post: 12-17-2018, 17:44
  3. When the first DOS is connected to 1LINK, can 2nd DOS be connected to 1st via Aquabus?
    By derekc in forum DŌS & DDR – Dosing and Fluid Metering System
    Replies: 4
    Last Post: 04-17-2018, 10:25
  4. Dos... Program to Dos later at night???
    By DarthSimon in forum DŌS & DDR – Dosing and Fluid Metering System
    Replies: 1
    Last Post: 08-17-2017, 11:45