Hello,
I just bought a Full Apex which is arriving this Friday. I been spending hours reading the online manual, and surfing the web on how to program my Jebao power heads using this adapter with the Apex I believe is what's needed to connect the 2 powerheads to the Apex?
http://www.amazon.com/Jebao-Neptune-...ao+adapter#Ask
My question is : I have a RedSea Reefer 250 which is 36" long, with 2x Jebao PP4 power heads. I can only run then together on level 2 , as I have allot of LPS
I would like to run them higher, and alternate between the two powerheads. So One side would run say 60% for a min, then turn off, and the other would tune one for the 1min. Then I would like them to run in a Nutrient mode, for say 15 min, to stir up and Detrius throughout the day. I would also Like them to slow down at night to 30%, as I understand the manual recommends for Tunze etc not to run them below 30%
I found this programming here, but not sure what everything is in it. I could always tweak the % of them.
Here's a thread I found on here :
https://forum.neptunesystems.com/sho...ll=1#post11852
But after reading all 8 pgs, theirs allot of suggestions that make the statements not work together
Is their a thread I could copy the programming, or anyone have one for using 2x Jeabo powerheads, to simulate the Ecotech Powerheads ?
Thank you for the help, I'd like to get the programming so when the Apex Arrives, I can get the powerheads up and running. I do need to buy the Adapter to run both powerheads through the Apex correct?
Bookmarks