I know I can do this however I recognise that cancelling the feed mode will switch all outputs back on immediately. I need a delay for my wavs and my skimmer if I cancel early and understand that I need to use a virtual outlet to allow me to do that but when I've tried I can't get the desired control. Selecting FeedB switches on virtual outlet Water_Change. I need the return to come on straight away once FeedB is cancelled but the three other devices to delay start for a further 5 minutes until levels are restored. I'm thinking these need to go into the individual devices programmes rather than the VO (as that would defer the return pump turning back on immediately as it applies to the entire output). So I need to add the code for the delay into the statement for individual devices for example this is my skimmer code
[Skimmer]
Fallback ON
Set ON
If FeedA 010 Then OFF
If Output Water_Change = ON Then OFF
If Output COR_RETURN Percent < 99 Then OFF
If Error COR_RETURN Then OFF
Defer 005:00 Then ON
and this the code for my VO for water changes, using FeedB as the control.
[Water_Change]
Set OFFFallback OFF
If FeedB 000 Then ON
I'm sure I'm missing something obvious, can anyone help please.
Bookmarks