Originally Posted by
IanB13
The Tunze Osmolator runs pretty well all on it's own. I'm trying to build a 10 minute delay after a power outage or return pump power off to allow the sump level to stabilize before the Osmolator kicks on (the sensor is in the sump, and my sump level stays low until the Bean Animal siphon kicks in after a few minutes). Will this work?:
Fallback ON
Set ON
If Output RetPump_1_4 = OFF Then OFF
If Power Apex Off 000 Then OFF
Defer 0010:00 Then ON
Thanks in advance for any input!
Bookmarks