    Do to our work schedule we don't feed our tank at the same time everyday. So what we currently do when it's dinner time for the tank is to manually turn off both wavs and the return pump. This means flipping each switch on fusion off and then on for the return and auto for the wavs after dinner. Is there away I can create a single switch in fusion that can be toggled to do this for us?

  2. #2
    Master Control Freak RussM's Avatar
    Join Date
    Dec 2012
    Location
    California - US Pacific
    Posts
    22,463
    Use a feed cycle timer. Then all it takes is one click in Fusion or a couple of button presses using the display module to activate that feed cycle.
    Please do not send me PMs with technical questions or requesting assistance - use the forums for Apex help. PM me ONLY if the matter is of a private or personal nature. Thanks.

  3. #3
    Frequent Visitor bigjim's Avatar
    Join Date
    Oct 2014
    Location
    Carpentersville, Il
    Posts
    367
    Never used a feed cycle before. I'll have to try and figure it out this weekend.

  4. #4
    Frequent Contributor SuncrestReef's Avatar
    Join Date
    Feb 2018
    Location
    Beaverton, OR
    Posts
    3,105
    Quote Originally Posted by bigjim View Post
    Never used a feed cycle before. I'll have to try and figure it out this weekend.
    Just add this code to any pump you want to turn off during feed mode:

    If FeedA 000 Then OFF

    You can also use FeedB, FeedC, and FeedD. The duration for each of the Feed timers can be set under Misc settings:

    Screen Shot 2019-01-04 at 2.55.41 PM.png

  5. #5
    Frequent Visitor bigjim's Avatar
    Join Date
    Oct 2014
    Location
    Carpentersville, Il
    Posts
    367
    Thanks, that works.

    Sent from my SM-G955U using Tapatalk

Similar Threads

  1. Controller Froze - how to troubleshoot, mitigate frozen state operations
    By Detour in forum Apex Classic/Apex Lite/Apex Jr
    Replies: 6
    Last Post: 08-21-2016, 17:46
  2. Question: Combining wizard and programming ?
    By maxreefer in forum APEX Fusion
    Replies: 7
    Last Post: 08-29-2015, 07:46
  3. Combining DEFER statements
    By qpurser in forum Misc Apex Usage & Programming
    Replies: 10
    Last Post: 03-01-2014, 07:59
  4. Question: EB6 combining outlets
    By Imad-Farhat in forum EnergyBars 832 / 632 / 8 / 6 / 4
    Replies: 14
    Last Post: 01-04-2014, 23:19

Bookmarks

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •