Hey everyone I need help setting up my two part dosing I want it to start at 21:00 and to end at 9:00 in the morning but it wouldn’t let me ,saying that it must be later than start time.
0EBC5258-8178-4E7C-85AC-FC5A2A262DAD.jpg
Hey everyone I need help setting up my two part dosing I want it to start at 21:00 and to end at 9:00 in the morning but it wouldn’t let me ,saying that it must be later than start time.
0EBC5258-8178-4E7C-85AC-FC5A2A262DAD.jpg
You need to create 2 sections.
How ?/
Modify the existing schedule interval so it ends sometime in the morning. Then add a new interval for whatever time you want to start dosing and ending at midnight. Split your total daily dose amount between the two as you desire.
That being said, you are better off just dosing evenly over the entire 24-hour period.
Please do not send me PMs with technical questions or requesting assistance - use the forums for Apex help. PM me ONLY if the matter is of a private or personal nature. Thanks.
Thank you I want to dose at night so I have less aggressive ph swings
I've been searching for a similar topic but can't seem to find what I'm looking for. I have the DOS and pump 1 is dosing Kalk for the 24hr period running at 7ml rate. This leaves me with 119 individual doses per day. I love that they are very small to have minimal impact on my livestock but this seems a bit overkill. How can I adjust the pump rate and doses per day manually? Is this possible?
The second head is functioning as an ATO linked to a float switch in my sump. I used a defer statement so that when the switch triggers the DOS it pumps for a minute and a half. All this works fine but the pump is running at a horribly slow speed. Again looking to somehow adjust this?
Thanks in advance!
Head:
Set OFF
If FeedD 000 Then OFF
If Sump_H CLOSED Then OFF
If ATO_S CLOSED Then PF1
PF1:
Dose Rate: 125ml
Pump Direction: forward
Per Dose Amount: 100ml
Dose Intervals: 700
Dose Count: 2
I wish that was the case. When ON it does continue to run but at the absolute minimum 7ml setting. Driving me nuts! It all works great now but there is no way for my code to 'check' the status of the switch after running the initial PF1. That's where I am stuck. So if it evaporated a little more or the skimmer was excited and the PF1 doesn't satisfy the switch to open again it never comes back on.