Hi all,
Despite attempts to cover the noise of my DOS including running at lowest setting and building a sound dampening enclosure I'm still not satisfied with the volume of the DOS while running on a continuous schedule. I would like to have my DOS do water changes on Mondays, Tuesdays, Thursdays, Fridays with Sa/Su/Wed being off days. I found a similar line of code for all days off but 1 (DOW SMTWTF- Then OFF). However, I have been unsuccessful altering it to my needs. Any help would be much appreciated!
Additionally, will adding a line of code for my optical sensor in my mixing tank along the lines of If SW_LO Open Then Off work to prevent water changes if the container were to empty?
Thanks!
Bookmarks