Originally Posted by
jgarcia
oh wow thats kinda new im possible for me
150 watt cobalt neo therm heater. i do have 2
core 20 main return x2 "will be ran as primary and secondary like we do in the piping industry"
core 15 for skimmer
modules: 4 fmm: 1 for atk"not powered and for ato top off from constant on ro system"not powered." 1 for leak detection"not powered." 1 for the ro system station "powered "emergency shut off sensored by flow meter" 1 for 3 flow sensors "not powered"
asm module
lsm module
wxm module
break out box module
1 kink module "powered" "future"
trident kit "eventually"
dos doser "automatic water change"
kessil h380 fuge lights
3 xr radion pro lights
3 computer fans coming from 3 1 link ports to a stepdown transformer. 1 for computer cabinet, 1 for sump cooling, 1 for hood each can be indivdually controlled
camera in display
camera in sump area.
light bar to see in sump area "cheapy"
4 mp10 power heads 2 connected to ecotech battery back up.... i hear un reliable tho?
Bookmarks