So I just purchased a new Apex to replace my Apex Classic. In this process I am splitting off one of the tanks that was on the apex to its own unit. Is there a way to interface between the two units? for example if Apex 1 is calling for top off water can Apex 2 turn on a solenoid to deliver the top off water?
Perhaps some way to do this using the 24v ports and a Break out box? (maybe the 24v port triggers a relay that connects two wires on the second units breakout box, then this is programmed to turn the solenoid on or off?)
If this isn't possible can the 24v port on the FMM be extended, lets say 50 feet?
Thanks!
Bookmarks